Location:
Jupiter is prominently located fronting the busy A5 (Watling Street), South Staffordshire's main arterial route, linking the East and West Midlands conurbations. The unit is 1 mile from the M6 Toll Road, Junction T7 and Junction T8, together with Junctions 11 and 12 of the M6 approximately 2 and 2.5 miles distant respectively.
Description:
Jupiter is a prominent new warehouse industrial unit fronting the A5, benefiting from the following:
Warehouse:
10 dock loading doors
3 level access doors
12.5m clear internal height
50kN m2 floor loading
Planning for B1c, B2 and B8 uses
Staff welfare block
Up to 800 kVA power
Racked
External:
127 car park spaces
11 trailer parking spaces
Up to 58m gated yard
Office:
Fully fitted first and second floor offices
LED lighting
Fully carpeted
Raised floors
Jupiter is a prominent new warehouse industrial unit fronting the A5, benefiting from the following: Energy efficient Solar Panels to provide up to 156 kWh per year, reducing the overall energy costs of the building to the occupier.
Ref: G7101
Key points:
10 docks / 3 level access
Up to 58m gated yard
Clear height 12.5m
Energy reducing solar panels
2 miles from M6 (J11)
Fully fitted and operational
Racked
Additional comments:
Contact:
Harris Lamb
Tel: 0121 4559455
Charles D' Auncey
charles.dauncey@harrislamb.com
EPC:
Jupiter, A5 Watling Street, Cannock, WS11 1SL
Location: Jupiter is prominently located fronting the busy A5 (Watling Street), South Staffordshire’s main arterial route, linking the East and West Midlands conurbations. The unit